Pakistan asks Iran to finance IP gas pipeline project

Published October 8, 2013
Pakistani Petroleum Minister Shahid Khaqan Abbasi talks with media representatives at his office in Islamabad on October 8, 2013. – AFP Photo
Pakistani Petroleum Minister Shahid Khaqan Abbasi talks with media representatives at his office in Islamabad on October 8, 2013. – AFP Photo

ISLAMABAD: Pakistan has asked Iran for $2 billion in financing to build its side of a controversial Iran-Pakistan (IP) gas pipeline that has drawn threats of US sanctions, Islamabad's petroleum minister said Tuesday.

The Iranian side of the $7.5-billion project is almost complete, but Pakistan has run into repeated problems paying for the 780 kilometre (485 mile) section to be built on its side of the border.

Pakistani petroleum minister Shahid Khaqan Abbasi told AFP on Tuesday that the preparatory work was complete, but they had asked Iran to provide $2 billion for the construction work.

“All these issues will be discussed in a meeting which we have requested, but so far there is no reply from the Iranian side,” Abbasi said.

“They were busy in cabinet formation and I hope that this meeting will take place within this month.”

It is the latest setback to hit the long-delayed section of the pipeline that would link the two neighbours and help ease Pakistan's chronic gas shortages.

US officials have warned that the project would risk triggering sanctions aimed at Iran.

But Abbasi denied coming under pressure from Washington since Prime Minister Nawaz Sharif came to power in the May general election. “Americans have not so far talked about this pipeline with us at any level,” he said.

Asked if Pakistan was hoping to complete the project before the December 2014 deadline, Abbasi replied: “Anything is possible, if we have the resources.” “It depends on the financing and availability of the machinery,” he added.

Iran has the second largest gas reserves in the world but has been strangled by a Western embargo that has seen its crude exports halved in the past year.

It currently produces around 600 million cubic metres of gas per day, almost all of which is consumed domestically due to lack of exports. Its only foreign client is Turkey, which buys about 30 million cubic metres of gas per day.

The Karachi stock exchange took fright when the countries' then-presidents Mahmoud Ahmadinejad and Asif Ali Zardari inaugurated the much-delayed section of pipeline in March.

Spooked by fears of US sanctions, the main index slumped almost 2.5 per cent.

Abbasi said the government had sought bids from Pakistani and Iranian companies for pricing of the construction cost of the pipeline.

Follow Dawn Business on Twitter, LinkedIn, Instagram and Facebook for insights on business, finance and tech from Pakistan and across the world.

Opinion

Editorial

A positive note
Updated 10 Feb, 2025

A positive note

With govt unable to press growth accelerator without upending fragile recovery, sufferings of low-middle-income households are unlikely to disappear soon.
Justice for all
10 Feb, 2025

Justice for all

ALONG with his domestic agenda, Donald Trump is busy ripping to shreds the post-World War II ‘rules-based...
Held back
10 Feb, 2025

Held back

IT is a crying shame how women are conspicuously absent from Pakistan’s civil services. Despite comprising half ...
Race against time
Updated 09 Feb, 2025

Race against time

While some bright spots emerged at Breathe Pakistan moot, we must streamline our climate governance.
Open door
09 Feb, 2025

Open door

THE door is still open for talks, National Assembly Speaker Ayaz Sadiq has reminded the PTI. What matters, however,...
Football suspension
09 Feb, 2025

Football suspension

ONCE again, Pakistan has been ousted from the global football family. FIFA recently suspended the Pakistan Football...