New dams, irrigation uplift on the cards

Published
0

LAHORE: The government will focus on constructing new water reservoirs and uplifting the existing irrigation infrastructure to meet the water scarcity challenge, reveals the Pakistan Economic Survey for the year 2020-21.

It notes that the country received 15.9pc and 45.8pc less than normal rainfall during post-monsoon (Oct-Dec) in 2020 and winter season (Jan-March) in 2021, indicating Pakistan is a water-stressed country and thus efficient use of water is important for provision of safe drinking water, sustainable agricultural and industrial growth.

Referring to vulnerability of the agriculture sector, core of national economy and food security, and changes in water availability, it calls for inclusive and comprehensive planning to handle the imminent water crisis. To overcome water scarcity and to enhance storage capacity, two major storage dams (Diamer-Bhasha and Mohmand Dam) along with 518 medium and small dams with total storage capacity of 8.33MAF have been initiated throughout the country, it says.

The survey mentions five important elements in the ongoing Water Sector Development Programme, costing Rs1.151tr – water augmentation, conservation, groundwater management, protection of infrastructure from water logging/salinity and floods and proposition of institutional reforms. Future water sector development strategies aim at construction of small, medium and large dams and development of existing irrigation and drainage infrastructure.

The economic survey says that completion of 22 ongoing projects at a cost of Rs124bn will bring about 40,000 acres under cultivation, especially in Balochistan, around1.567m acres of agriculture land will protected from water logging and salinity by completion of RBOD-I & III in Sindh, rainwater harvesting of 0.21 MAF will be done through construction of small dams in Balochistan, recharging 1,000 wells and improvement of about 400 Karezes in Balochistan.

Around Rs46bn have been allocated for construction of large/medium dams followed by Rs10bn for small/recharge/check dams.

For remodeling of existing irrigation system, a sum of Rs961m is planned to be spent, though the programme will be gradually transferred to the provinces, and about Rs6.84bn are expected to be incurred for construction of new canals – Kachhi, Rainee, Warsak and Maki Farash Link Canal.

The work on projects for improvement of watercourses, water conservation in barani areas of Khyber Pakhtunkhwa and enhancing command area in barani areas in all provinces, including Azad Jammu and Kashmir and Gilgit-Baltistan will continue during the next financial year.

Published in Dawn, June 11th, 2021

Opinion

Editorial

Kashmir unresolved
Updated 30 Sep, 2026

Kashmir unresolved

The just solution lies in India addressing the issue through a trilateral dialogue involving the legitimate representatives of the Kashmiri people and Pakistan.
Water shortage
30 Sep, 2026

Water shortage

THAT the country is entering the Rabi season with an anticipated water shortage of nearly 25pc, the lowest carryover...
Young hearts
30 Sep, 2026

Young hearts

THE observance may have passed, but the message of World Heart Day should not fade with it. The occasion is a useful...
Terror and politics
Updated 29 Sep, 2026

Terror and politics

There is an urgent need to tone down the rhetoric and tackle terrorism as a collective challenge for both the affected provinces and the federation.
Watching the glaciers
29 Sep, 2026

Watching the glaciers

THE latest signs from Pakistan’s mountains are worrying. Suparco says the number of unfrozen glacial lakes it...
Dangerous agenda
29 Sep, 2026

Dangerous agenda

AS the world remains fixated on the US-Iran conflict, elsewhere in the Middle East, Israel is consolidating its grip...