CHITRAL, Jan 10: Chitral-Booni road is in dilapidated condition owing to lack of maintenance and repair since its completion in 1994. The 75-km-long road was constructed with the assistance of the Asian Development Bank.

Passing through series of mountains, the road is vulnerable to natural hazards and needs annual repair.

Landsliding and debris on roadsides had reduced the width of the road to hardly six feet in most places.

Boulders from hills have made ditches in the road and are yet to be removed.

With every torrential rain and snowfall, the condition of the road is getting worse with ever rising number of accidents, but the department concerned is least bothered.

The road links upper and lower parts of the district and leads to Baroghil Pass, which borders the Wakhan corridor of Afghanistan.

During the Shandur festival, thousands of tourists use the road.

With the completion of the under construction suspension bridge at Mastuj, Chitral will be linked with the Chinese market through this road.

Opinion

Editorial

Iran stalemate
Updated 02 May, 2026

Iran stalemate

THE US and Iran are currently somewhere between war and peace. While a tenuous ceasefire — extended largely due to...
Tax shortfall
02 May, 2026

Tax shortfall

THE Rs684bn shortfall in tax collection during the first 10 months of the fiscal year is a continuation of a...
Teaching inclusion
02 May, 2026

Teaching inclusion

DISCRIMINATORY and exclusionary content in Punjab’s textbooks has been flagged in Inclusive Education for a United...
Water vision
01 May, 2026

Water vision

WATER insecurity in Pakistan has been building up for decades as per capita water availability has declined from...
Vaccine policy
01 May, 2026

Vaccine policy

PAKISTAN has finally approved its first National Vaccine Policy; a step the health ministry has rightly described as...
Labour rights
Updated 01 May, 2026

Labour rights

THE annual observance of May Day should move beyond statements about the state’s commitment to the rights of...