RLNG pipeline in Rahim Yar Khan targeted in bomb attack

Published January 9, 2019
A timed explosive device was planted in a 36-inch-diameter pipeline at Bhong Road in Sadiqabad. ─ Photo by author
A timed explosive device was planted in a 36-inch-diameter pipeline at Bhong Road in Sadiqabad. ─ Photo by author

A Karachi-Islamabad re-gasified liquefied natural gas (RLNG) pipeline feeding industry, gas stations and domestic consumers in central Punjab was targeted in a bomb attack in Rahim Yar Khan early on Wednesday.

According to Sui Northern Gas Pipeline Ltd (SNGPL) sources, the blast was caused by a timed explosive device. The explosives were planted in the pipeline at Bhong Road in Sadiqabad near the Bhong Sui Gas repeater station A-1, Rescue 1122 officials said.

SNGPL's chief engineer transmission Muhammad Shoaib told Dawn that the RLNG pipeline, with a 36-inch diameter and wall thickness of 0.588 inches, was laid one year ago to supply gas from Karachi to Islamabad. The pipeline feeds the industry, gas stations and domestic consumers in central Punjab.

Shoaib said that last night terrorists had dug a three-foot hole at the main RLNG pipeline and fixed a device at the top, which blew up the pipeline.

He said the incident took place at 2:40 am adding that the system was under control by 3:05 am. Shoaib said that rehabilitation work of the pipeline had started and it would be restored in the next 48 hours.

Assistant Commissioner (AC) Sadiqabad Abbas Raza Nasir described the blast as "a terrorist act". Following the attack, eight firetrucks under Rescue 1122, SNGPL and a private factory reached the spot to extinguish the fire.

AC Nasir told Dawn that SNGPL engineers had also arrived at the site of the blast and that two scientists were expected to arrive shortly to conduct forensic tests. According to the AC, restoration will take between 24 and 48 hours.

According to SNGPL's Muhammad Shoaib, nearly 40 to 50 blasts have taken place in the area since 2002. He said that last month terrorists had fixed an explosive device at the RLNG pipeline near Sadiq canal in Sardar Garh but security guards had intervened in a timely manner and removed the bomb. The terrorists, however, had escaped.

A gas crisis hit Pakistan in December and proliferated across the country, forcing industry closures across Punjab and Karachi, even as domestic consumers in many areas faced low gas pressure and outages.

In a meeting of the Cabinet Committee on Energy presided over by Prime Minister Imran Khan on Tuesday, the government decided to announce a new power policy, in hopes to overcome the prevailing gas shortage.

Follow Dawn Business on X, LinkedIn, Instagram and Facebook for insights on business, finance and tech from Pakistan and across the world.

Opinion

Editorial

US asylum freeze
Updated 05 Dec, 2025

US asylum freeze

IT is clear that the Trump administration is using last week’s shooting incident, in which two National Guard...
Colours of Basant
05 Dec, 2025

Colours of Basant

THE mood in Lahore is unmistakably festive as the city prepares for Basant’s colourful kites to once again dot the...
Karachi’s death holes
05 Dec, 2025

Karachi’s death holes

THE lidless manholes in Karachi lay bare the failure of the city administration to provide even the bare necessities...
Protection for all
Updated 04 Dec, 2025

Protection for all

ACHIEVING true national cohesion is not possible unless Pakistanis of all confessional backgrounds are ensured their...
Growing trade gap
04 Dec, 2025

Growing trade gap

PAKISTAN’S merchandise exports have been experiencing a pronounced decline for the last several months, with...
Playing both sides
04 Dec, 2025

Playing both sides

THERE has been yet another change in the Azad Jammu and Kashmir Legislative Assembly. The PML-N’s regional...