KARACHI: Anti-encroachment staffers of the Karachi Metropolitan Corporation (KMC) continued their operation on Friday to demolish and clean-up illegal structures from the Gujjar Nala so that in the event of heavy rains, there is no hindrance to rainwater draining into the sea.

A statement released by the KMC says that so far over 414 concrete houses and other structures including cattle pens have been demolished during the operation in which heavy machinery was used. A 5.5km portion of the 13-km long storm-water drain had been cleaned up so far between Café Piyala and Bangali Para, and around Niaz Manzil.

KMC Administrator Laeeq Ahmed has directed anti-encroachment staffers to demolish all illegal structures from other drains too so that people do not have to face any hardships in the event of rain.

Published in Dawn, July 30th, 2016

Opinion

Editorial

Hasty transition
Updated 05 May, 2024

Hasty transition

Ostensibly, the aim is to exert greater control over social media and to gain more power to crack down on activists, dissidents and journalists.
One small step…
05 May, 2024

One small step…

THERE is some good news for the nation from the heavens above. On Friday, Pakistan managed to dispatch a lunar...
Not out of the woods
05 May, 2024

Not out of the woods

PAKISTAN’S economic vitals might be showing some signs of improvement, but the country is not yet out of danger....
Rigging claims
Updated 04 May, 2024

Rigging claims

The PTI’s allegations are not new; most elections in Pakistan have been controversial, and it is almost a given that results will be challenged by the losing side.
Gaza’s wasteland
04 May, 2024

Gaza’s wasteland

SINCE the start of hostilities on Oct 7, Israel has put in ceaseless efforts to depopulate Gaza, and make the Strip...
Housing scams
04 May, 2024

Housing scams

THE story of illegal housing schemes in Punjab is the story of greed, corruption and plunder. Major players in these...