CHITRAL: Snowfall continued for the third day here on Sunday throughout the Chitral valley stretching from Arandu to Broghil, Shandur and Gobor, where snow has accumulated with height ranging from two to four feet.

The snowfall has caused blowing of intensely cold winds across the valley keeping the people confined to their homes, as a result of which the valley gave a deserted look.

The road link between Chitral and the rest of the country via Lowari tunnel is opened for all kinds of vehicular traffic where heavy machinery has been deployed in the approach road to clear the snow instantly.

Roads to Garam Chashma and Madak Lasht are closed for vehicular traffic while the arteries of Shandur, Torkhow, Laspur and Bumurate are said to be intact for traffic.

The supply of electricity from the national grid via Lowari Pass is still intact providing uninterrupted electric supply to Lower Chitral and many villages of Upper Chitral.

Published in Dawn, January 6th, 2025

Opinion

Editorial

UAE’s Opec exit
Updated 30 Apr, 2026

UAE’s Opec exit

THE UAE’s exit from Opec is another sign of the major geopolitical shifts that are reshaping the global order. One...
Uncertain recovery
30 Apr, 2026

Uncertain recovery

PAKISTAN’S growth projections for the current fiscal present a cautiously hopeful picture, though geopolitical...
Police ‘encounters’
30 Apr, 2026

Police ‘encounters’

THE killing of nine suspects by Punjab’s Crime Control Department across Lahore, Sahiwal and Toba Tek Singh ...
Growth to stability
Updated 29 Apr, 2026

Growth to stability

THE State Bank’s decision to raise its key policy rate by 100 basis points to 11.5pc signals a shift in priorities...
Constitutional order
29 Apr, 2026

Constitutional order

FOLLOWING the passage of the 26th and 27th Amendments, in 2024 and 2025 respectively, jurists and members of the...
Protecting childhood
29 Apr, 2026

Protecting childhood

AN important victory for child protection was secured on Monday with the Punjab Assembly’s passage of the Child...