What is happening to Pakistan’s Green Stimulus?

Published June 1, 2022
Around the region of Heroshah in Khyber Pakhtunkhwa, previously arid hills are now covered with forest. — AFP/File
Around the region of Heroshah in Khyber Pakhtunkhwa, previously arid hills are now covered with forest. — AFP/File

Wajahat Shah, 32, is a labourer at a government-run tree plantation, spread over 3,000 hectares of army land in Khyber Pakhtunkhwa. “Ten days after the government announced the lockdown due to coronavirus, I had to close my grocery shop,” Shah told The Third Pole.

The plantation is part of the Ten Billion Tree Tsunami Programme, the flagship initiative of the recently ousted PTI government. The project has been a lifesaver for up to 85,000 residents like Shah, Mohammad Usman Khan, a forest officer, said.

Before Covid-19, Shah earned as much as Rs25,000 (USD 129) a month from his shop. Now, his work at the plantation gives him PKR 15,000 (USD 77), and he also receives a small monthly rent from his shop, which is being run by someone else.

“I know this is much less, but our family of three has fewer needs [now]; I also prefer working outdoors,” he said, adding that this way he gets time to study for his bachelor’s degree.

Read: As a 'green stimulus', Pakistan sets virus-idled to work planting trees

However, forest officer Khan admitted that turning 3,000 hectares of barren army land into an oasis, growing olive, ziziphus lotus, rosewood, acacia trees and more, is too big a task for the 50 labourers the plantation employs. The government’s hands, he explained, were tied due to lack of funds.

The area — 32 kilometres from Peshawar — has plenty of water, with groundwater drawn from solar-powered tubewells, but not enough manpower. “We should have at least eight labourers for every 40 hectares,” said Khan, adding that it may not be possible to green the area without more staff.

A ‘booster dose’ for conservation

Pakistan’s Green Stimulus, a USD 120 million loan from the World Bank, was conceived as a “booster dose” for this and similar nature-based projects, said former minister for climate change, Malik Amin Aslam, using a Covid-19 analogy.

The money, originally earmarked for a project by the Pakistan Meteorological Department, was redirected to nature restoration in response to hardship created by Covid-19, Aslam said.

Speaking to The Third Pole on April 29 following Imran Khan’s removal as prime minister, he said he feared the package may face delays.

These “nature-positive funds” Aslam said, referring to the Green Stimulus package, were “literally within arm’s reach”, with the first tranche to be released by April 15. “The first phase was ready for rollout – when we ourselves got prematurely rolled out!” he rued.

Pakistan’s Green Stimulus fits within the scope of the UN Decade on Ecosystem Restoration 2021–2030, a framework focused on reversing ecosystem loss to fight the climate crisis. It “was meant to protect nature and give green jobs to thousands of people including youth and women”, Aslam explained.

Now with Pakistan in political turmoil, Aslam feared that “all efforts to protect nature and give green jobs may well go down the drain”.

New minister wants to continue green stimulus

Aslam’s concerns may be unfounded. Sherry Rehman, the new climate change minister, told The Third Pole that the grant will remain available to Pakistan. The World Bank, she explained, is supporting the country, not a particular administration under a certain party, so the agreement still stands.

The Third Pole contacted the World Bank about the status of the loan; a reply had not been received at the time of publication.

According to the agreement, a body called the National Disaster & Risk Management Fund will receive the funds and distribute them to various departments. Eleven projects have already been vetted and approved by the bank.

“The MoCC [Ministry of Climate Change] would like to continue with [the Green Stimulus] initiative and adopt any course correction in future if necessary,” Rehman said.

Upon taking office, however, she was expecting the ministry to be more than “a single project implementation department” dedicated solely to planting trees.

“[The MoCC] is essentially a policy ministry, not a project implementation department,” she pointed out, detailing her vision of the climate change ministry, which includes policy design, monitoring provinces and engaging internationally with the global community to press Pakistan’s case as a low net polluter.

But above all, Rehman said, “[the ministry] needs Pakistan to engage in a public conversation on conservation and climate goals through state and community action”.

Read: Pakistan needs to go beyond tree planting to thrive after Covid-19

She noted the absence of a climate communication cell at the ministry, as well as the fact that the federal secretary’s post remains vacant. And when it comes to gender, she added, “institutional frameworks in Pakistan are inadvertently designed to preserve inequity”.

The Climate Council, a forum where representatives for the provinces meet to discuss and cooperate on frameworks for climate action, has been dormant with not a single meeting held in the past four years, she added. “All this needs to change,” she said.

Acknowledging that Rehman would have a “good idea” of the country’s needs and priorities on the climate front, Aslam cautioned that “implementation and focus” require political ownership and the understanding and backing needed at the highest level “may be missing in this administration”.

Domestic reform is the new priority

Aslam said adopting the “two-pronged approach of using clean energy transition and nature-based solutions” is essential. Reversing targets set by the previous government, he warned, will not only have ecological but economic and social consequences that Pakistan can ill afford.

He said he hoped the present government “can comprehend this and take the logical way forward towards climate compatible development”.

However, Rehman commented that she worried that Pakistan has been put in a “commitment trap” where, at the international level, “it has promised far more than it can even measure, let alone deliver.”

“While commitments to lower emissions were made abroad, no infrastructure or institutional reform was attempted at home for a genuine energy transition,” she pointed out.

And despite the “existential” nature of the crisis, no awareness was built either at a policymaking or a community level. “No work or public messaging on water deficits were made,” said Rehman, even though Pakistan will be water-scarce by 2025, according to the UN. “It seems that climate solutions have been reduced to tree plantation only.”


This article was originally published on The Third Pole and has been reproduced here with permission.

Opinion

Editorial

IMF’s projections
Updated 18 Apr, 2024

IMF’s projections

The problems are well-known and the country is aware of what is needed to stabilise the economy; the challenge is follow-through and implementation.
Hepatitis crisis
18 Apr, 2024

Hepatitis crisis

THE sheer scale of the crisis is staggering. A new WHO report flags Pakistan as the country with the highest number...
Never-ending suffering
18 Apr, 2024

Never-ending suffering

OVER the weekend, the world witnessed an intense spectacle when Iran launched its drone-and-missile barrage against...
Saudi FM’s visit
Updated 17 Apr, 2024

Saudi FM’s visit

The government of Shehbaz Sharif will have to manage a delicate balancing act with Pakistan’s traditional Saudi allies and its Iranian neighbours.
Dharna inquiry
17 Apr, 2024

Dharna inquiry

THE Supreme Court-sanctioned inquiry into the infamous Faizabad dharna of 2017 has turned out to be a damp squib. A...
Future energy
17 Apr, 2024

Future energy

PRIME MINISTER Shehbaz Sharif’s recent directive to the energy sector to curtail Pakistan’s staggering $27bn oil...