CHITRAL: The University of Chitral has launched Pakistan’s first ever open educational resources (OER) website to facilitate its students as well as people with learning disposition all over the globe during closure the educational institutions in the wake of coronavirus threat.

The project director of the university, Prof Badshah Munir Bukhari, told journalists here on Wednesday that the website was a gateway to hundreds of universities and websites offering free online courses, audio and video lectures, e-books, research journals and countless educational material.

“University of Chitral has provided online learning management system to its students from the very outset and now with a bold forward step it has launched this (OER) website which can benefit all those people, who are actively studying in any university of the world, and those, who aspire for online degrees from home or workplace,” said Prof Badshah.

He said that the website was also a gateway to access the database of National Digital Library of Pakistan, the library of HEC and the best free online libraries of the world. He added that the website would provide a platform to the scholars and students, who were conducting research in any filed.

“The website can be accessed through the URL www.oer.uoch.pk,” said Prof Badshah.

POWER PROJECT: Both the two faults proved accurate in the Golen Gol hydropower project that had been pointed out by its chief consultant four years ago during its construction and tendered his resignation when his technical advice was ignored.

Sources in Wapda, the executing agency of the power project, told Dawn that the German consultant George had pointed out that an imperfect place had been selected for the diversion point in the intake of the power channel, which was vulnerable to flood in the stream.

They said that the consultant had proposed the passage of the national grid through the Lowari tunnel instead of Lowari Pass, which received heavy snow during the winter season as a result of which it was disconnected from the national grid for long.

Sources said that in the aftermath of glacial lake outburst flood in July last, the intake point of the power channel was overrun by the flood debris and the power house was closed down for more than six months thereby inflicting a huge loss on the national exchequer.

Published in Dawn, April 23rd, 2020

Opinion

Editorial

IMF’s unease
Updated 24 May, 2024

IMF’s unease

It is clear that the next phase of economic stabilisation will be very tough for most of the population.
Belated recognition
24 May, 2024

Belated recognition

WITH Wednesday’s announcement by three European states that they intend to recognise Palestine as a state later...
App for GBV survivors
24 May, 2024

App for GBV survivors

GENDER-based violence is caught between two worlds: one sees it as a crime, the other as ‘convention’. The ...
Energy inflation
Updated 23 May, 2024

Energy inflation

The widening gap between the haves and have-nots is already tearing apart Pakistan’s social fabric.
Culture of violence
23 May, 2024

Culture of violence

WHILE political differences are part of the democratic process, there can be no justification for such disagreements...
Flooding threats
23 May, 2024

Flooding threats

WITH temperatures in GB and KP forecasted to be four to six degrees higher than normal this week, the threat of...