TAXILA: Though Prime Minister Nawaz Sharif has directed power utility companies to ensure power supply during Sehr and Iftar, consumers here spent the first day of Ramazan amid prolonged outages on Sunday.

Residents said Iesco had promised that there would be no loadshedding from 3am to 5pm and 6pm to 10pm. However, on the first day of the holy month, prolonged loadshedding hit many areas and as a result those offering Taraveeh faced problems in the sweltering heat.

According to the consumers, the electricity supply was closed for one hour after every hour throughout the day and there were also power failures. With the temperature rising, the prolonged outages added to the difficulties of the people.

Housewives said they were disappointed as loadshedding made it almost impossible to cook food.

“I have to prepare Sehri in the darkness while the weather was hot and humid,” said Samia Saqib, a resident of Lalazar.

Naveed Ahmed Khan of Lalarukh said he knew the government’s promise, especially that made by Minister of State for Water and Power Abid Sher Ali, would fall flat and there would be no relief from loadshedding during Ramazan.

“There was continuous power tripping during Taraveeh and the humid weather added to the problems of the people,” said Tauqir Riaz.

When contacted, an Iesco official at the Wah grid station said the demand increased sharply during Sehr and so they had to resort to loadshedding.

The subdivisional officer (SDO) Wah circle claimed that there was a technical problem in the transformers due to which the supply had to be closed for many hours on Sunday morning.

Published in Dawn, May 29th, 2017

Opinion

Editorial

X post facto
Updated 19 Apr, 2024

X post facto

Our decision-makers should realise the harm they are causing.
Insufficient inquiry
19 Apr, 2024

Insufficient inquiry

UNLESS the state is honest about the mistakes its functionaries have made, we will be doomed to repeat our follies....
Melting glaciers
19 Apr, 2024

Melting glaciers

AFTER several rain-related deaths in KP in recent days, the Provincial Disaster Management Authority has sprung into...
IMF’s projections
Updated 18 Apr, 2024

IMF’s projections

The problems are well-known and the country is aware of what is needed to stabilise the economy; the challenge is follow-through and implementation.
Hepatitis crisis
18 Apr, 2024

Hepatitis crisis

THE sheer scale of the crisis is staggering. A new WHO report flags Pakistan as the country with the highest number...
Never-ending suffering
18 Apr, 2024

Never-ending suffering

OVER the weekend, the world witnessed an intense spectacle when Iran launched its drone-and-missile barrage against...