LAHORE: The Lahore Development Authority (LDA) has invited applications from contractors or engineering firms registered with the Pakistan Engineering Council (PEC) for the construction of elevated expressway along with bus stations and allied facilities from Zafar Ali Road and Main Boulevard of Gulberg to Ring Road and motorway.

The length of the Rs25bn project is 10.7km which will be built over the Cantt drain. It also includes constructions of bus stations and approach and exit ramps at selected locations along the route.

The applications as per request for quotation (RFQ) documents will be received till 2pm on March 16 and would be opened at 2:30pm (same day and date) in the presence of the bidders or their representatives.

Meanwhile, the Town Planning Wing of the LDA demolished 10 illegal constructions and sealed another one in various localities of the city during a drive against violation of building regulations.

The demolished illegal properties included six shops on the Canal Road (near Bahria Town), a commercial structure near Bhoptian Chowk, four illegal shops on the Abdus Sattar Edhi Road near Punjab University Scheme Phase-1 and illegal part of a factory near EME Society while illegal construction of the first floor of a buildings was sealed.

Published in Dawn, February 28th, 2017

Opinion

Editorial

Missing links
27 Apr, 2024

Missing links

THE deplorable practice of enforced disappearances is an affront to due process and the rule of law. Pakistan has...
Freedom to report?
27 Apr, 2024

Freedom to report?

AN accountability court has barred former prime minister Imran Khan and his wife from criticising the establishment...
After Bismah
27 Apr, 2024

After Bismah

BISMAH Maroof’s contribution to Pakistan cricket extends beyond the field. The 32-year old, Pakistan’s...
Business concerns
Updated 26 Apr, 2024

Business concerns

There is no doubt that these issues are impeding a positive business clime, which is required to boost private investment and economic growth.
Musical chairs
26 Apr, 2024

Musical chairs

THE petitioners are quite helpless. Yet again, they are being expected to wait while the bench supposed to hear...
Global arms race
26 Apr, 2024

Global arms race

THE figure is staggering. According to the annual report of Sweden-based think tank Stockholm International Peace...