ISLAMABAD, Oct 8: Pakistan has asked Iran for $2 billion in financing to build its side of a gas pipeline that has drawn threats of US sanctions, according to petroleum minister.

The Iranian side of the $7.5-billion project is almost complete, but Pakistan has run into problems paying for the 780km section to be built on its side of the border.

Petroleum Minister Shahid Khaqan Abbasi said on Tuesday the preparatory work was complete, but the government had asked Iran to provide $2 billion for the construction work.

“All these issues will be discussed in a meeting which we have requested, but so far there is no reply from the Iranian side,” Mr Abbasi said.

“They were busy in cabinet formation and I hope that this meeting will take place within this month.”

It is the latest setback to hit the long-delayed section of the pipeline that would link the two neighbours and help ease Pakistan’s chronic gas shortages.

US officials have warned that the project would risk triggering sanctions aimed at Iran.

But Mr Abbasi denied coming under pressure from Washington since Prime Minister Nawaz Sharif came to power in the May general elections. “Americans have not so far talked about this pipeline with us at any level,” he said. Asked if Pakistan was hoping to complete the project before the December 2014 deadline, the minister replied: “Anything is possible, if we have the resources.

“It depends on the financing and availability of the machinery,” he added.

Iran has the second largest gas reserves in the world but has been strangled by a western embargo that has seen its crude exports halved in the past year.

It currently produces around 600 million cubic metres of gas per day, almost all of which is consumed domestically due to lack of exports. Its only foreign client is Turkey, which buys about 30 million cubic metres of gas per day.

Mr Abbasi said the government had sought bids from Pakistani and Iranian companies for pricing of the construction cost of the pipeline.

He said that due to shortage of gas in winter, all compressed natural gas (CNG) stations in Punjab would be shut down from November to January.

Many Pakistanis have converted their cars to run on CNG, depending on it as a cheaper alternative to petrol and diesel.

“Our first priority are domestic consumers during the winters, so there will be no gas for motor transport in Punjab,” Mr Abbasi said.—AFP

Opinion

A state of chaos

A state of chaos

The establishment’s increasingly intrusive role has further diminished the credibility of the political dispensation.

Editorial

Bulldozed bill
Updated 22 May, 2024

Bulldozed bill

Where once the party was championing the people and their voices, it is now devising new means to silence them.
Out of the abyss
22 May, 2024

Out of the abyss

ENFORCED disappearances remain a persistent blight on fundamental human rights in the country. Recent exchanges...
Holding Israel accountable
22 May, 2024

Holding Israel accountable

ALTHOUGH the International Criminal Court’s prosecutor wants arrest warrants to be issued for Israel’s prime...
Iranian tragedy
Updated 21 May, 2024

Iranian tragedy

Due to Iran’s regional and geopolitical influence, the world will be watching the power transition carefully.
Circular debt woes
21 May, 2024

Circular debt woes

THE alleged corruption and ineptitude of the country’s power bureaucracy is proving very costly. New official data...
Reproductive health
21 May, 2024

Reproductive health

IT is naïve to imagine that reproductive healthcare counts in Pakistan, where women from low-income groups and ...