KARACHI, Dec 31: The city government has finalized an action plan to put an end to accidents at the Nagan Chowrangi.

A city government official said the action plan included checking violation of traffic signals, illegal traffic movements, high speed, display of banners at low height obstructing drivers' vision, and frequent power failure disrupting signal system.

The plan said that traffic generated in North Karachi and Surjani towns and going towards the city centre and Sohrab Goth passed through this intersection.

According to the traffic volume survey, a total of 207,252 vehicles passed through it daily. The maximum traffic movement was directed towards Sakhi Hassan and North Karachi.

The total composition of traffic consisted of 32.25 per cent motorcycles and 40.21 per cent cars/jeeps/suzukis. Although, the percentage of minibuses and buses, and trucks and trailers was low i.e. 13.5 and 0.42 per cent respectively, their contribution to the accident rate was predominant.

However, the report adds that the recently occurred two accidents were not exactly at Nagan Chowrangi; however, the Chowrangi was said to be the root cause of one of the accidents, which took the lives of two girls.

The action plan sets certain recommendations for improving the situation by removing illegal encroachments and taxi stands existing at the intersection, while holding the town municipal administration and area police responsible for making the area free from encroachments.

Speed control measures had also been proposed at approaches of all three arterial links by lane markings, arrow markings, pedestrian crossings and delineation of facing islands. All markings would be supplemented with road studs and cat's eyes with the provision of guide signs and traffic signs.

Some minor physical improvements to the chowrangi were required. There were also certain points, which required vigilant manning by traffic police such as enforcement of bus stops and taxi stands, prevention of illegal movements and manual control of intersection when the traffic signal was out of work.

The report meanwhile identified from the traffic flow pattern that there was very little traffic on approaches to Unda More and Godhra. Considering the accident rate, it was recommends that a study be undertaken on priority basis by appointing consultants for providing grade-separated facility at this location.

CONTINGENCY PLAN: The District Coordination Officer, Karachi has directed the Fire Brigade and Civil Defence departments of the city government to devise a foolproof contingency plan considering the disaster caused by the recent tsunami that hit nine Indian Ocean countries. - PPI

Opinion

Editorial

Sustainable path?
Updated 13 Jun, 2026

Sustainable path?

The FY27 budget is the first clear signal that the government is ready to transition from stabilisation to growth.
Prioritising education
13 Jun, 2026

Prioritising education

THOUGH the improvement in the country’s literacy rate may be slight, as highlighted by the Economic Survey, it ...
Poverty’s rise
13 Jun, 2026

Poverty’s rise

AS attention turns to the government’s plans for the coming fiscal year, one set of figures deserves particular...
A difficult story
Updated 12 Jun, 2026

A difficult story

Unless productivity becomes the dominant target of economic policy, Pakistan will continue to oscillate between crises and fragile recovery.
Rough waters
12 Jun, 2026

Rough waters

AMONGST the key potential triggers for fresh conflict in South Asia is water. The Indian state is behaving in an...
Politicised football
12 Jun, 2026

Politicised football

ALMOST three-and-half years since Lionel Messi led Argentina to FIFA World Cup glory, the latest edition of...