The United Arab Emirates (UAE) has begun construction on a major pipeline to carry desalinated water from Egypt to southern Gaza, AFP reports.

Technical teams sent by the UAE have started transporting equipment needed for the project, the Emirati state news agency WAM reported.

The nearly seven-kilometre pipeline aims to help alleviate what WAM described as a “water crisis” in the Gaza Strip.

WAM said the UAE had launched “several initiatives to drill and rehabilitate potable water wells”.

Read more here.

Opinion

Editorial

UAE’s Opec exit
Updated 30 Apr, 2026

UAE’s Opec exit

THE UAE’s exit from Opec is another sign of the major geopolitical shifts that are reshaping the global order. One...
Uncertain recovery
30 Apr, 2026

Uncertain recovery

PAKISTAN’S growth projections for the current fiscal present a cautiously hopeful picture, though geopolitical...
Police ‘encounters’
30 Apr, 2026

Police ‘encounters’

THE killing of nine suspects by Punjab’s Crime Control Department across Lahore, Sahiwal and Toba Tek Singh ...
Growth to stability
Updated 29 Apr, 2026

Growth to stability

THE State Bank’s decision to raise its key policy rate by 100 basis points to 11.5pc signals a shift in priorities...
Constitutional order
29 Apr, 2026

Constitutional order

FOLLOWING the passage of the 26th and 27th Amendments, in 2024 and 2025 respectively, jurists and members of the...
Protecting childhood
29 Apr, 2026

Protecting childhood

AN important victory for child protection was secured on Monday with the Punjab Assembly’s passage of the Child...