Two die from electrocution as rain continues in Karachi

Published June 28, 2025
A truck is stuck in a pothole on a dilapidated road in the Malir Halt area after rain.— PPI
A truck is stuck in a pothole on a dilapidated road in the Malir Halt area after rain.— PPI

KARACHI: Two young men died from electrocution in SITE and Surjani Town as light rain continued intermittently across the metropolis on Friday.

While the Karachi Metropolitan Corporation (KMC) is yet to complete the de-silting of major storm water drains in the city, roads in many areas submerged by rainwater, causing vehicular traffic to move at a snail’s pace.

The condition of roads and streets under the town municipal corporations’ administrative control was also unimpressive.

In its weather advisory issued on Friday, the Met Office said that due to strong monsoon currents penetrating over the province, Karachi continues to receive intermittent rain on Saturday (today).

According to the Met Office, Surjani Town received the highest count of rain, 16 millimetres, on Friday followed by Bahria Town 10.2mm, North Karachi 6.8mm, Orangi Town. 6.1mm, Gulshan-i-Maymar 5.4mm and Saddar 5mm. Other parts of the city received below 5mm or just traces.

A factory worker was electrocuted inside the industrial unit in the SITE area.

Area SHO Sajjad Khan Afridi told Dawn that Kamran Asghar, 20, died when he suffered an electric shock at around 1:30am.

In another incident, a 21-year-old man was electrocuted in Surjani Town.

Area SHO Mohammed Ali Shah said that Ahmed Haider Ali suffered an electric shock when he touched the gate of his house during rain.

Meanwhile, an unidentified young man died when a wall of a house collapsed near Bakra Piri. The body was shifted to the Dr Ruth Pfau Civil Hospital Karachi.

The Met Office said that rain / thunderstorm with moderate to isolated heavy falls is likely in Karachi, Hyderabad, Umerkot, Mirpurkhas, Badin, Thatta, Sujawal, Dadu, Sukkur, Larkana, Qamber Shahdadkot, Shikarpur, Khairpur, Naushahro Feroze, Shaheed Benazirabad, Matiari, Sanghar, Jamshoro, Tando Allahyar, Tando Muhammad Khan, Jacobabad, Ghotki, Kashmore and Tharparker districts till Sunday.

Prolonged power outages

Residents of the metropolis spent a sleepless night as power supply in many parts of the metropolis disrupted with the first drop of rain and took up to 10 hours to restore.

However, the K-Electric claimed in a press release that despite sporadic rain across the city, “uninterrupted power supply continued through over 1,600 out of 2,100 feeders”.

It said that the KE briefly isolated supply on feeders serving low-lying areas and field teams were mobilised to restore electricity.

Published in Dawn, June 28th, 2025

Opinion

Trouble at home

Trouble at home

The country’s strength lies in its political and economic stability, not in fleeting moments of diplomatic success.

Editorial

Pezeshkian’s visit
Updated 24 Jun, 2026

Pezeshkian’s visit

Perhaps a good place to start would be the resumption of work on the Iran-Pakistan gas pipeline.
Telecom bill
24 Jun, 2026

Telecom bill

THERE is now no question about it: the Pakistan Telecommunication (Re-organisation) (Amendment) Bill of 2026 is a...
Updating Islamabad
24 Jun, 2026

Updating Islamabad

ISLAMABAD is growing rapidly. Its planning, however, remains stuck in bureaucratic limbo. Despite years of ...
Unsustainable growth
Updated 23 Jun, 2026

Unsustainable growth

CLICHÉS are an essential part of political rhetoric. But when repeated often, they lose their impact. So when...
Banned speeches
23 Jun, 2026

Banned speeches

NATIONAL Assembly Speaker Ayaz Sadiq on Sunday formally lifted long-standing restrictions on the airing of ...
New GB government
23 Jun, 2026

New GB government

WITH the newly elected lawmakers of the Gilgit-Baltistan Assembly taking oath on Monday, the PPP looks set to head...