RCB to finally repair 150-year-old bridge at Transit Camp

Published December 8, 2022
The over century-old bridge that connects the city and cantonment areas has been closed to traffic for  the last few months. — File photo
The over century-old bridge that connects the city and cantonment areas has been closed to traffic for the last few months. — File photo

RAWALPINDI: After a months-long wait, the Rawalpindi Cantonment Board (RCB) finally agreed to repair more than a century-old bridge at Transit Camp connecting the cantonment with the city region.

This was decided in a meeting held at Station Headquarters with Station Commander Brigadier Sulman Nazar in the chair. The meeting was attended by Divisional Superintendent Railways Inamullah, commissioner’s representative Mazhar Nadeem, representative of Punjab’s minister for parliamentary affairs and senior officials of the RCB and district administration.

It was decided that the Punjab government would provide funds for the repair work to connect Ratta Amral (city area) to Raja Akram Shaheed Road in Cantt near Transit Camp while RCB would do the repair work.

Pakistan Railways Divisional Superintendent Inamullah informed the meeting that the condition of the bridge was dilapidated and it was in dire of need repair work. He added that it was the responsibility of the civic authority to do the job.

According to the railways official, the bridge will remain closed for heavy traffic following the repair work as it would extend its life. He said that if the heavy traffic stopped plying on the bridge then it would remain operational for the next 25 years.

After a detailed discussion with local engineers of the RCB and district administration, it was decided to start the repair work and impose a ban on heavy traffic on the bridge.

Punjab govt to release funds for renovation, heavy traffic to be banned

Speaking on the occasion, Brigadier Nazar directed the departments concerned to start the repair work without wasting any further time. He also asked the RCB to make a plan to repair the dilapidated roads in the cantonment areas on a priority basis.

The representatives of the Punjab government assured the meeting that the government would release the funds as soon as possible for the repair of the bridge and the dilapidated roads in the cantonment areas falling within the limits of the provincial constituencies.

It may be noted that the Rawalpindi Cantonment Board had refused to repair the bridge, saying that it was the responsibility of the Pakistan Railways to maintain the bridge.

PR’s Rawalpindi division had closed the dilapidated bridge over its main track between Rawalpindi and Peshawar after the district administration and the cantonment authorities failed to repair it.

The bridge was declared dangerous by railway authorities in September after its dyke wall collapsed owing to years of negligence. Subsequently, the railway authorities placed barricades on both sides of the bridge.

The bridge connecting the city and cantonment areas of Rawalpindi is used by commuters coming from I.J. Principal Road, Peshawar Road, and other routes. Its closure has resulted in tailbacks on Ganjmandi Road, City Saddar Road and Gawalmandi.

Published in Dawn, December 8th, 2022

Opinion

Editorial

Ties with Tehran
Updated 24 Apr, 2024

Ties with Tehran

Tomorrow, if ties between Washington and Beijing nosedive, and the US asks Pakistan to reconsider CPEC, will we comply?
Working together
24 Apr, 2024

Working together

PAKISTAN’S democracy seems adrift, and no one understands this better than our politicians. The system has gone...
Farmers’ anxiety
24 Apr, 2024

Farmers’ anxiety

WHEAT prices in Punjab have plummeted far below the minimum support price owing to a bumper harvest, reckless...
By-election trends
Updated 23 Apr, 2024

By-election trends

Unless the culture of violence and rigging is rooted out, the credibility of the electoral process in Pakistan will continue to remain under a cloud.
Privatising PIA
23 Apr, 2024

Privatising PIA

FINANCE Minister Muhammad Aurangzeb’s reaffirmation that the process of disinvestment of the loss-making national...
Suffering in captivity
23 Apr, 2024

Suffering in captivity

YET another animal — a lioness — is critically ill at the Karachi Zoo. The feline, emaciated and barely able to...