Boat bridge dismantled after rise in water level

Published August 7, 2022
TOBA TEK SINGH: Traffic through a boat bridge on river Ravi linking Bhussi Kathia area in Kamalia and Kassowal in Chichawatni has been suspended following rise in water. — Dawn
TOBA TEK SINGH: Traffic through a boat bridge on river Ravi linking Bhussi Kathia area in Kamalia and Kassowal in Chichawatni has been suspended following rise in water. — Dawn

TOBA TEK SINGH: Traffic on a temporary boat bridge built at Bhussi Kathia (a small town in Kamalia tehsil) on the Ravi in November 2021 to connect it with Chak 117/7 DR located in Kassowal tehsil (Sahiwal), has been suspended after the increase in water level in the river.

A local -- Asif Kathia -- told this correspondent on Saturday that the bridge had reduced at least 50-km distance between Bhussi Kathia and Kassowal.

He said: “Traffic moves to Bhussi Kathia from Adda Waroana, located some 20 kilometers on Kamalia-Chichawatni road, and after crossing the Ravi through the boat bridge, at least 20-km travel distance shortens as Kassowal is just 10-km away from the bridge.”

An area farmer -- Mian Asad Hafiz -- said wooden pieces laid on the boat bridge had been removed and kept by the irrigation department staff so that after the end of flood season, the bridge could again be made functional after reassembling it.

Published in Dawn, August 7th, 2022

Opinion

Editorial

On press freedoms
Updated 03 May, 2026

On press freedoms

THE citizenry forgets, to its own peril, how important a free and independent media is in the preservation of their...
Inflation strain
03 May, 2026

Inflation strain

PAKISTAN’S return to double-digit inflation after 21 months signals renewed economic strain where external shocks...
Troubled waters
03 May, 2026

Troubled waters

PAKISTAN’S water crisis is often framed in terms of scarcity. Increasingly, it is also a crisis of contamination....
Iran stalemate
Updated 02 May, 2026

Iran stalemate

THE US and Iran are currently somewhere between war and peace. While a tenuous ceasefire — extended largely due to...
Tax shortfall
02 May, 2026

Tax shortfall

THE Rs684bn shortfall in tax collection during the first 10 months of the fiscal year is a continuation of a...
Teaching inclusion
02 May, 2026

Teaching inclusion

DISCRIMINATORY and exclusionary content in Punjab’s textbooks has been flagged in Inclusive Education for a United...