Protesters block Garam Chashma Road, Chitral. — Dawn
Protesters block Garam Chashma Road, Chitral. — Dawn

CHITRAL: Hundreds of residents of Lot Koh valley continued their sit-in for the third day in Garam Chashm on Sunday against the use of ‘substandard’ material in repair of a key road and delay in reconstruction of a collapsed suspension bridge connecting the valley with rest of the district.

Addressing the protesters, local elders, including Nusrat Elahi, Mir Dula, Khosh Mohammad and others, said the condition of Garam Chashma Road had worsened since the National Highway Authority (NHA) got its control from the communication and works department three years ago.

They said a suspension bridge connecting the valley with other parts of the district had collapsed two months ago at a time when the bumper crop of potato was being transported to the down country. They said the local farmers had restored traffic by building a makeshift bridge on self-help basis. They said NHA had yet to make a plan for construction of a permanent bridge.

The elders accused the NHA of using substandard material in the rehabilitation of Garam Chashma Road. They said condition of roads in the neighbouring Arkari and Karim Abad valleys was also bad.

They vowed to continue protesting till work on construction of the bridge and quality repair of the Garam Chashma Road was not started.

They demanded of federal minister of communications Murad Saeed to tender resignation over his failure to improve the state of roads in Chitral district.

Published in Dawn, November 15th, 2021

Opinion

Editorial

Missing links
Updated 27 Apr, 2024

Missing links

As the past decades have shown, the country has not been made more secure by ‘disappearing’ people suspected of wrongdoing.
Freedom to report?
27 Apr, 2024

Freedom to report?

AN accountability court has barred former prime minister Imran Khan and his wife from criticising the establishment...
After Bismah
27 Apr, 2024

After Bismah

BISMAH Maroof’s contribution to Pakistan cricket extends beyond the field. The 32-year old, Pakistan’s...
Business concerns
Updated 26 Apr, 2024

Business concerns

There is no doubt that these issues are impeding a positive business clime, which is required to boost private investment and economic growth.
Musical chairs
26 Apr, 2024

Musical chairs

THE petitioners are quite helpless. Yet again, they are being expected to wait while the bench supposed to hear...
Global arms race
26 Apr, 2024

Global arms race

THE figure is staggering. According to the annual report of Sweden-based think tank Stockholm International Peace...