Power transmission capacity surges to 16,300MW

Published July 5, 2015
Minister says steps being taken to resolve low voltage issue.—Online/File
Minister says steps being taken to resolve low voltage issue.—Online/File

LAHORE: The government has increased its national power transmission capacity to 16,300MW and plans to take it up to 21,000MW by the end of next year, claims Minister of State for Water and Power Abid Sher Ali.

Addressing a press conference here on Saturday after a meeting with managing director of the National Transmission and Dispatch Company (NTDC), he said the government had increased this capacity from 13,750MW to 16,300MW in the last two years.

Besides laying a number of power transmission lines, one 500Kv and nine 220Kv grid stations had been constructed to improve flow of power transmission. These steps would also take care of low voltage and other related problems following the up-gradation of transmission and distribution system by the end of 2016, he said.

Know more: More electricity, less loadshedding promised

Apart from improving the transmission system, the PML-N government was also working on contingency measures to avoid cascading effects, which led to national breakdown early this year.


Minister says steps being taken to resolve low voltage issue


About persistent loadshedding in Peshawer Valley (Swat, Mardan, Swabi), he blamed inability of the Khyber Pakhtunkhwa government to provide lands for construction of grid station in those areas and termed it main reason for supply and distribution problems in the area. “Of late, the KP government has allocated land and one 500Kv grid station will be constructed in the area by the end of 2016, which will take care of the problem to a large extent.”

The minister also took the occasion to deny any forced loadshedding in the country.

He said about 80 per cent of urban and rural areas were exempted from loadshedding during Sehr and Iftar.

Talking about high loss localities, the minister particularly mentioned some areas of the Sukkur Electric Supply Company (Sepco). “Losses on 320 feeders range between 60 and 100pc and on 110 feeders show 40 to 45pc deficit. This is totally unbearable as these losses alone translate into Rs1 billion a month.”

He also claimed that the Sindh government was unable or unwilling to clear its dues worth Rs32 billion, which exclude a reconciled amount of Rs21 billion. “Despite such a huge write off, the provincial government has paid only Rs2.5 billion. This kind of default saps the sector and its ability to run smoothly.”

Abid Sher Ali insisted that power availability in the system had already showed a significant improvement and reiterated that loadshedding would end by 2017. “There is only 6-8 hours loadshedding in the country now.”

Referring to delay in laying transmission line linking Neelum-Jhelum Hydropower Project with national grid, he said, it would be completed in June 2016.

A company had taken this issue to the court which led to delay in execution of the project, he said.

He expressed resentment over the rising cost of the Neelum-Jhelum Hydropower Project, saying his government would not tolerate such practices in future.

Published in Dawn, July 5th, 2015

On a mobile phone? Get the Dawn Mobile App: Apple Store | Google Play

Opinion

Editorial

Under siege
Updated 03 May, 2024

Under siege

Whether through direct censorship, withholding advertising, harassment or violence, the press in Pakistan navigates a hazardous terrain.
Meddlesome ways
03 May, 2024

Meddlesome ways

AFTER this week’s proceedings in the so-called ‘meddling case’, it appears that the majority of judges...
Mass transit mess
03 May, 2024

Mass transit mess

THAT Karachi — one of the world’s largest megacities — does not have a mass transit system worth the name is ...
Punishing evaders
02 May, 2024

Punishing evaders

THE FBR’s decision to block mobile phone connections of more than half a million individuals who did not file...
Engaging Riyadh
Updated 02 May, 2024

Engaging Riyadh

It must be stressed that to pull in maximum foreign investment, a climate of domestic political stability is crucial.
Freedom to question
02 May, 2024

Freedom to question

WITH frequently suspended freedoms, increasing violence and few to speak out for the oppressed, it is unlikely that...