ISLAMABAD, Oct 8: Pakistan has asked Iran for $2 billion in financing to build its side of a gas pipeline that has drawn threats of US sanctions, according to petroleum minister.

The Iranian side of the $7.5-billion project is almost complete, but Pakistan has run into problems paying for the 780km section to be built on its side of the border.

Petroleum Minister Shahid Khaqan Abbasi said on Tuesday the preparatory work was complete, but the government had asked Iran to provide $2 billion for the construction work.

“All these issues will be discussed in a meeting which we have requested, but so far there is no reply from the Iranian side,” Mr Abbasi said.

“They were busy in cabinet formation and I hope that this meeting will take place within this month.”

It is the latest setback to hit the long-delayed section of the pipeline that would link the two neighbours and help ease Pakistan’s chronic gas shortages.

US officials have warned that the project would risk triggering sanctions aimed at Iran.

But Mr Abbasi denied coming under pressure from Washington since Prime Minister Nawaz Sharif came to power in the May general elections. “Americans have not so far talked about this pipeline with us at any level,” he said. Asked if Pakistan was hoping to complete the project before the December 2014 deadline, the minister replied: “Anything is possible, if we have the resources.

“It depends on the financing and availability of the machinery,” he added.

Iran has the second largest gas reserves in the world but has been strangled by a western embargo that has seen its crude exports halved in the past year.

It currently produces around 600 million cubic metres of gas per day, almost all of which is consumed domestically due to lack of exports. Its only foreign client is Turkey, which buys about 30 million cubic metres of gas per day.

Mr Abbasi said the government had sought bids from Pakistani and Iranian companies for pricing of the construction cost of the pipeline.

He said that due to shortage of gas in winter, all compressed natural gas (CNG) stations in Punjab would be shut down from November to January.

Many Pakistanis have converted their cars to run on CNG, depending on it as a cheaper alternative to petrol and diesel.

“Our first priority are domestic consumers during the winters, so there will be no gas for motor transport in Punjab,” Mr Abbasi said.—AFP

Opinion

Editorial

Border clashes
19 May, 2024

Border clashes

THE Pakistan-Afghanistan frontier has witnessed another series of flare-ups, this time in the Kurram tribal district...
Penalising the dutiful
19 May, 2024

Penalising the dutiful

DOES the government feel no remorse in burdening honest citizens with the cost of its own ineptitude? With the ...
Students in Kyrgyzstan
19 May, 2024

Students in Kyrgyzstan

BEING stranded on foreign shores is hardly an agreeable experience. And if the environment is hostile — as it...
Ominous demands
Updated 18 May, 2024

Ominous demands

The federal government needs to boost its revenues to reduce future borrowing and pay back its existing debt.
Property leaks
18 May, 2024

Property leaks

THE leaked Dubai property data reported on by media organisations around the world earlier this week seems to have...
Heat warnings
18 May, 2024

Heat warnings

STARTING next week, the country must brace for brutal heatwaves. The NDMA warns of severe conditions with...