KARACHI, Sept 17: With a slight drop in temperature, enhanced oil and gas supplies to increase power generation and the improved support of two independent power producers and Wapda, the Karachi Electric Supply Company managed to curtail load-shedding hours by supplying a little over 2,000 megawatts to the city on Wednesday.

As the maximum temperature climbed down to 33.8 degrees centigrade, after a long spell of heat wave that had gripped the city, the total electricity demand dropped to around 2,200 megawatts. Besides, the power utility generated about 11 megawatts from its own resources with the enhanced oil and gas supplies.

The sources said the KESC through its own generation resources could produce 1,100 megawatts, including up to 1,000MWs from the Bin Qasim Thermal Power Station. The generation output from the Bin Qasim plant increased as the Sui Southern Gas Company provided 300MMFCD gas supply to the KESC.

Many areas came under two spells of load-shedding till Iftar. Each time the power supply was suspended for over an hour and a half on the day when the senate’s standing committee on water and power, led by Senator Javed Leghari, met the Abraj Capital-led new management of the power utility.

The sources said the Defence-Cogen desalination plant, which could produce 80 megawatts, was out of order and it would remain so for long for the purpose of maintenance of its turbine. Eighty megawatts generated by the Karachi Nuclear Power Plant had also not been available since Monday morning due to the loss of transmission lines, they said.

A spokesman for the power utility said the KESC faced power shortage of 150MWs to 200MWs on Wednesday.

Later talking to Dawn, Senator Javed Leghari said he had cautioned that if the new management of the power utility did not make any phenomenal improvement in its generation and transmission systems within the next six months, there would be more frequent and prolonged outages next summer. He said the new management had been asked to increase the generation level to an optimum by running the Bin Qasim power plant and Korangi Thermal Power Station to their full capacity.

Opinion

Editorial

GB polls’ aftermath
Updated 11 Jun, 2026

GB polls’ aftermath

The new administration must address the region’s issues proactively.
Peace in retreat
11 Jun, 2026

Peace in retreat

THE ceasefire announced in April was supposed to create space for negotiations. Instead, it has been repeatedly...
A few good men
11 Jun, 2026

A few good men

IT was a brave move, no doubt. This Tuesday, in the land of the Afghan Taliban, a few good men decided to take a...
Centre vs provinces
Updated 10 Jun, 2026

Centre vs provinces

The reason the centre finds itself in this position is rooted in its failure to expand the tax net and boost revenues.
Party in crisis
10 Jun, 2026

Party in crisis

THE young KP chief minister must be starting to realise just how thorny a seat he occupies. There has been a flurry...
Varsity woes
10 Jun, 2026

Varsity woes

FINANCIAL crises affecting public sector universities across Pakistan are now having an impact on academic...