Nasa to launch moon rocket on Aug 29

Published
2
Artemis-1 is set to journey around the far side of the Moon in a mission lasting four to six weeks -- longer than any ship for astronauts has done without docking, before returning home faster and hotter than ever before. — AFP
Artemis-1 is set to journey around the far side of the Moon in a mission lasting four to six weeks -- longer than any ship for astronauts has done without docking, before returning home faster and hotter than ever before. — AFP

WASHINGTON: Mark your calendars: Nasa’s Artemis programme to return to the Moon could launch its first uncrewed test flight as soon as August 29, the agency said on Wednesday.

Artemis-1 is the first in a series of missions as the United States seeks to return humans to the Moon, build a sustained presence there, and use the lessons gained to plan a trip to Mars sometime in the 2030s.

Nasa associate administrator Jim Free told reporters the first window of possible launch dates for the giant Space Launch System (SLS) and Orion crew capsule were August 29, September 2, and September 5.

The decision follows final checks on the ground at the Kennedy Space Center in Florida known as “wet dress rehearsals.” The last of these tests, carried out in June, met 90 percent of the team’s goals, and on Wednesday Cliff Lanham, senior vehicle operations manager, said engineers have now replaced faulty seals that had caused a hydrogen leak on SLS during the final trial.

Artemis-1 is set to journey around the far side of the Moon in a mission lasting four to six weeks — longer than any ship for astronauts has done without docking, before returning home faster and hotter than every vessel before.

It will also deploy a number of small satellites called CubeSats to perform experiments in space.

Artemis mission manager Mike Sarafin told reporters: “Our first and our primary objective is to demonstrate Orion’s heat shield in lunar reentry conditions.” When the capsule returns from the Moon, it will be traveling about 24,500 miles an hour (39,400 kilometers per hour) and experience temperatures half as hot as the Sun outside its heat shield.

The second objective is to demonstrate the flight worthiness of the rocket and crew capsule as they perform all their maneuvers over the course of the mission.

Finally, Nasa will look to successfully retrieve Orion after splashdown, and thoroughly inspect it.

Artemis-2 will be the first crewed test, flying around the Moon but not landing, while Artemis-3 will see the first woman and first person of color touch down on the lunar south pole.

Published in Dawn, July 21st, 2022

Opinion

Editorial

Muddled hierarchy
Updated 15 Nov, 2026

Muddled hierarchy

The jurisdiction of the two courts and a mechanism for settling disputes between them should be spelt out in law, not left to judges to fight over.
Growing crisis
Updated 15 Nov, 2026

Growing crisis

Calling population growth a national emergency is easy. Ensuring that the response reaches the people who need it is the real challenge.
Organised rackets
15 Nov, 2026

Organised rackets

ON the International Day against Transnational Organised Crime, observed today, Pakistan finds itself in a tight...
Referendum talk
Updated 14 Nov, 2026

Referendum talk

Unless the PPP is deliberately using Sindh as a bargaining chip, it should issue a clarification with a clear, consistent position on new administrative units, not one tailored to protect its home turf.
Mineral wealth
Updated 14 Nov, 2026

Mineral wealth

Minerals should not be presented as a solution to Pakistan’s long-term economic difficulties. The aim should be to build an industrial base rather than export raw materials.
Late diagnosis
14 Nov, 2026

Late diagnosis

AS we mark World Diabetes Day today, Pakistan faces a troubling question: how many people are living with diabetes...