'What an amazing milestone': Nasa's James Webb telescope fully deployed in space

Published January 8, 2022
In this photo released by Nasa, engineering teams at Nasa's James Webb Space Telescope Mission Operations Centre at the Space Telescope Science Institute in Baltimore, Maryland monitor progress as the observatory’s second primary mirror wing rotates into position. — AFP
In this photo released by Nasa, engineering teams at Nasa's James Webb Space Telescope Mission Operations Centre at the Space Telescope Science Institute in Baltimore, Maryland monitor progress as the observatory’s second primary mirror wing rotates into position. — AFP
In this photo released by Nasa, engineering teams celebrate at the Space Telescope Science Institute in Baltimore, Maryland as the second primary mirror wing of Nasa's James Webb Space Telescope unfolds, before beginning the process of latching the mirror wing into place. — AFP
In this photo released by Nasa, engineering teams celebrate at the Space Telescope Science Institute in Baltimore, Maryland as the second primary mirror wing of Nasa's James Webb Space Telescope unfolds, before beginning the process of latching the mirror wing into place. — AFP

The James Webb Space Telescope completed its two-week-long deployment phase on Saturday, unfolding the final mirror panel as it readies to study every phase of cosmic history.

Engineering teams cheered back at the Space Telescope Science Institute in Baltimore, Maryland as the National Aeronautics and Space Administration (Nasa) announced on Twitter that the final wing was deployed.

“I'm emotional about it — what an amazing milestone,” Thomas Zurbuchen, a senior Nasa engineer, said during the live video feed as stargazers worldwide celebrated.

Because the telescope was too large to fit into a rocket's nose cone in its operational configuration, it was transported folded-up.

Unfurling has been a complex and challenging task — the most daunting such project ever attempted, according to Nasa.

“We've still got work to do,” NASA said as the wing was latched into place. “When the final latch is secure, Nasa Webb will be fully unfolded in space.”

The most powerful space telescope ever built and the successor to Hubble, Webb blasted off in an Ariane 5 rocket from French Guiana on December 25, and is heading to its orbital point, 1.5 million kilometres from Earth.

Though Webb will reach its space destination, known as the second Lagrange point, in a matter of weeks, it still has around another five and a half months of setup to go.

Next steps include aligning the telescope's optics and calibrating its scientific instruments.

Far reaches of the Universe

Its infrared technology will allow it to see the first stars and galaxies that formed 13.5 billion years ago, giving astronomers new insight into the earliest epoch of the Universe.

Earlier this week, the telescope deployed its five-layered sunshield — a 70-foot-long, kite-shaped apparatus that acts like a parasol, ensuring Webb's instruments are kept in the shade so they can detect faint infrared signals from the far reaches of the Universe.

The sunshield will be permanently positioned between the telescope and the Sun, Earth and Moon, with the Sun-facing side built to withstand 230 degrees Fahrenheit (110 degrees Celsius).

Read: Most powerful ever built — exploring Nasa's James Webb Space Telescope

Visible and ultraviolet light emitted by the very first luminous objects has been stretched by the Universe's expansion, and arrives today in the form of infrared, which Webb is equipped to detect with unprecedented clarity.

Its mission also includes the study of distant planets to determine their origin, evolution, and habitability.

The Nasa telescope blog said Saturday's procedure was “the last of the major deployments on the observatory.”

“Its completion will set the stage for the remaining five and a half months of commissioning, which consist of settling into stable operating temperature, aligning the mirrors, and calibrating the science instruments. “

Opinion

Editorial

Sustainable path?
13 Jun, 2026

Sustainable path?

THE FY27 budget is the first clear signal that the government is ready to transition from stabilisation to growth ...
Prioritising education
13 Jun, 2026

Prioritising education

THOUGH the improvement in the country’s literacy rate may be slight, as highlighted by the Economic Survey, it ...
Poverty’s rise
13 Jun, 2026

Poverty’s rise

AS attention turns to the government’s plans for the coming fiscal year, one set of figures deserves particular...
A difficult story
Updated 12 Jun, 2026

A difficult story

Unless productivity becomes the dominant target of economic policy, Pakistan will continue to oscillate between crises and fragile recovery.
Rough waters
12 Jun, 2026

Rough waters

AMONGST the key potential triggers for fresh conflict in South Asia is water. The Indian state is behaving in an...
Politicised football
12 Jun, 2026

Politicised football

ALMOST three-and-half years since Lionel Messi led Argentina to FIFA World Cup glory, the latest edition of...