ISLAMABAD, Aug 22: The Pakistan Railways (PR) will install modern signalling equipment on its entire main network in a period of six years.

This was stated by the minister for railways, Ghous Bux Khan Mehr, on Friday while answering a point-of-order raised by MNA Farid Ahmad Paracha in the National Assembly session.

The railways minister said the signalling system would be installed on Rohri-Lodhran-Khanewal section (both via loop and chord) and Sahiwal-Shahdara Bagh section.

He said at present, about 58 per cent fleet of the locomotives on the system had become overage.

The minister said there was a need to replace about 300 of the locomotives. For this purpose, as many as 20 locomotives of 3,000 horsepower (HP) have been manufactured at Pakistan Locomotive Factory, Risalpur, at a cost of Rs180 million per locomotive, he added.

Fifteen diesel engine locomotives of Chinese origin will be imported in completely-built condition where as the remaining 54 locomotives will be assembled in the country, the minister said.

He said the PR was generally running its trains in loss on all branch lines, however, improvement would be made by introducing new Chinese coaches on the track.

The minister said planning was being done to improve the dilapidated condition of “Khushhal Khan Khattak Express” running from Peshawar to Karachi. The express will be overhauled in Carriage Factory, Islamabad, he added.—APP

Opinion

Editorial

Centre vs provinces
Updated 10 Jun, 2026

Centre vs provinces

The reason the centre finds itself in this position is rooted in its failure to expand the tax net and boost revenues.
Party in crisis
10 Jun, 2026

Party in crisis

THE young KP chief minister must be starting to realise just how thorny a seat he occupies. There has been a flurry...
Varsity woes
10 Jun, 2026

Varsity woes

FINANCIAL crises affecting public sector universities across Pakistan are now having an impact on academic...
Doctor attacked
09 Jun, 2026

Doctor attacked

AN act of reprehensible violence has shaken the medical community. On Saturday, an employee of the Provincial Civil...
AJK flare-up
Updated 09 Jun, 2026

AJK flare-up

The situation started deteriorating after a trader affiliated with the JAAC was reportedly shot in an altercation with law-enforcers.
Fault lines
09 Jun, 2026

Fault lines

THE April 8 ceasefire that halted hostilities between Israel and Iran has encountered its most serious test yet....