ISLAMABAD, Oct 8: Pakistan has asked Iran for $2 billion in financing to build its side of a gas pipeline that has drawn threats of US sanctions, according to petroleum minister.

The Iranian side of the $7.5-billion project is almost complete, but Pakistan has run into problems paying for the 780km section to be built on its side of the border.

Petroleum Minister Shahid Khaqan Abbasi said on Tuesday the preparatory work was complete, but the government had asked Iran to provide $2 billion for the construction work.

“All these issues will be discussed in a meeting which we have requested, but so far there is no reply from the Iranian side,” Mr Abbasi said.

“They were busy in cabinet formation and I hope that this meeting will take place within this month.”

It is the latest setback to hit the long-delayed section of the pipeline that would link the two neighbours and help ease Pakistan’s chronic gas shortages.

US officials have warned that the project would risk triggering sanctions aimed at Iran.

But Mr Abbasi denied coming under pressure from Washington since Prime Minister Nawaz Sharif came to power in the May general elections. “Americans have not so far talked about this pipeline with us at any level,” he said. Asked if Pakistan was hoping to complete the project before the December 2014 deadline, the minister replied: “Anything is possible, if we have the resources.

“It depends on the financing and availability of the machinery,” he added.

Iran has the second largest gas reserves in the world but has been strangled by a western embargo that has seen its crude exports halved in the past year.

It currently produces around 600 million cubic metres of gas per day, almost all of which is consumed domestically due to lack of exports. Its only foreign client is Turkey, which buys about 30 million cubic metres of gas per day.

Mr Abbasi said the government had sought bids from Pakistani and Iranian companies for pricing of the construction cost of the pipeline.

He said that due to shortage of gas in winter, all compressed natural gas (CNG) stations in Punjab would be shut down from November to January.

Many Pakistanis have converted their cars to run on CNG, depending on it as a cheaper alternative to petrol and diesel.

“Our first priority are domestic consumers during the winters, so there will be no gas for motor transport in Punjab,” Mr Abbasi said.—AFP

Opinion

Editorial

Missing links
Updated 27 Apr, 2024

Missing links

As the past decades have shown, the country has not been made more secure by ‘disappearing’ people suspected of wrongdoing.
Freedom to report?
27 Apr, 2024

Freedom to report?

AN accountability court has barred former prime minister Imran Khan and his wife from criticising the establishment...
After Bismah
27 Apr, 2024

After Bismah

BISMAH Maroof’s contribution to Pakistan cricket extends beyond the field. The 32-year old, Pakistan’s...
Business concerns
Updated 26 Apr, 2024

Business concerns

There is no doubt that these issues are impeding a positive business clime, which is required to boost private investment and economic growth.
Musical chairs
26 Apr, 2024

Musical chairs

THE petitioners are quite helpless. Yet again, they are being expected to wait while the bench supposed to hear...
Global arms race
26 Apr, 2024

Global arms race

THE figure is staggering. According to the annual report of Sweden-based think tank Stockholm International Peace...