National power grid survives major breakdown

Published December 12, 2014
Electricity being restored in several areas as technical fault in Tarbela and Ghazi Barotha powerhouses disrupts supply to 70pc of Punjab and KP.—File photo
Electricity being restored in several areas as technical fault in Tarbela and Ghazi Barotha powerhouses disrupts supply to 70pc of Punjab and KP.—File photo

ISLAMABAD: The national power grid survived a major breakdown on Friday as the Tarbela and Ghazi Barotha powerhouses suffered a technical fault, depriving a large part of Khyber Pakhtunkhwa and Punjab province of electricity for almost five hours.

According to a spokesman for the Water and Power Ministry, NTDC engineers had managed to temporarily fix the transmission line, which suffered a major fault earlier today. However, the spokesman said that efforts were still being made to synchronise the power frequencies to restore regular production of electricity from all power plants.

Mardan, Swabi, Nowshera, Haripur, Attock, Lahore, Gujranwala, Sialkot, Gujrat, Faisalabad, Chakwal, Jehlum were some of the areas affected by the technical breakdown today, including complete disruption of power supply in some regions.

Power was temporarily restored to several parts of KP and Punjab at the time of filing of this report, while engineers were working to restore supply to other affected areas.

Officials of the water and power ministry said that at around 11am, a technical fault appeared in the Tarbela Power plant, which also affected the power production from Ghazi Barotha, causing the Northern Transmission line to trip.

The fault resulted in a disruption of electricity supply to 70 per cent areas of KP province, and north and central Punjab. The tripping of the main transmission line also resulted in the breakdown of supply from other power plants.

Officials said that timely response from the National Power Control Center helped avert a major breakdown of the power system, which could have even resulted in nationwide electricity supply disruption similar to what was witnessed across Pakistan in 2012.

Upper KP, southern Punjab, Balochistan and Sindh stayed unaffected from the breakdown.

According to sources, the technical fault in Tarbela was triggered because of production being unable to match levels of demand, as a minimum amount of electricity is being generated from furnace oil-based power plants during the day.

A major portion of electricity supply for Punjab and Khyber Pakhtunkhwa is dependent on power generation from Tarbela and Mangla dams.

Follow Dawn Business on Twitter, LinkedIn, Instagram and Facebook for insights on business, finance and tech from Pakistan and across the world.

Opinion

Editorial

Narcotic darkness
08 May, 2024

Narcotic darkness

WE have plenty of smoke with fire. Citizens, particularly parents, caught in Pakistan’s grave drug problem are on...
Saudi delegation
08 May, 2024

Saudi delegation

PLANS to bring Saudi investment to Pakistan have clearly been put on the fast track. Over the past month, Prime...
Reserved seats
Updated 08 May, 2024

Reserved seats

The truth is that the entire process — from polls, announcement of results, formation of assemblies and elections to the Senate — has been mishandled.
Impending slaughter
Updated 07 May, 2024

Impending slaughter

Seven months into the slaughter, there are no signs of hope.
Wheat investigation
07 May, 2024

Wheat investigation

THE Shehbaz Sharif government is in a sort of Catch-22 situation regarding the alleged wheat import scandal. It is...
Naila’s feat
07 May, 2024

Naila’s feat

IN an inspirational message from the base camp of Nepal’s Mount Makalu, Pakistani mountaineer Naila Kiani stressed...