THIS refers to your editorial ‘Deadly industrial effluent’ (May 4). For a long time now, Karachi’s beaches have been polluted by untreated waste discharged into the sea by Lyari and Malir Rivers.

Back in 1991, the Karachi Water and Sewerage Board embarked upon an ambitious programme to make sewage treatment plants in Mauripur, utilising funds given by the Asian Development Bank.

In 1992, two salt works were forced to close down and instead of being utilised by the sewerage plants, the land (900 acres) was given to private transport contractors and a truck stand was constructed but so far there is no sign of a sewerage treatment plant despite the passage of 22 years. The poisonous effluent continues to be discharged into the ocean.

Shakir Lakhani
Karachi

Opinion

Editorial

Rigging claims
Updated 04 May, 2024

Rigging claims

The PTI’s allegations are not new; most elections in Pakistan have been controversial, and it is almost a given that results will be challenged by the losing side.
Gaza’s wasteland
04 May, 2024

Gaza’s wasteland

SINCE the start of hostilities on Oct 7, Israel has put in ceaseless efforts to depopulate Gaza, and make the Strip...
Housing scams
04 May, 2024

Housing scams

THE story of illegal housing schemes in Punjab is the story of greed, corruption and plunder. Major players in these...
Under siege
Updated 03 May, 2024

Under siege

Whether through direct censorship, withholding advertising, harassment or violence, the press in Pakistan navigates a hazardous terrain.
Meddlesome ways
03 May, 2024

Meddlesome ways

AFTER this week’s proceedings in the so-called ‘meddling case’, it appears that the majority of judges...
Mass transit mess
03 May, 2024

Mass transit mess

THAT Karachi — one of the world’s largest megacities — does not have a mass transit system worth the name is ...