Level crossings’ closure creates problems for motorists

Published April 18, 2020
Motorcyclists use a pedestrian bridge over the railway line near Gondwanaland Phattak. — Dawn
Motorcyclists use a pedestrian bridge over the railway line near Gondwanaland Phattak. — Dawn

GUJRANWALA: All the railway gates of the city have been locked since March 21 due to lockdown creating problems for motorists to travel across the city.

Gujranwala is situated along GT Road while 20km long track runs across the city with five level crossings on it. The railway track divides the city into two parts and the closure of the crossings has made it impossible for motorists to reach the other side.

Most of the government offices and educational institutes are on the eastern side of the track. Other than ordinary vehicles, ambulances have to take longer routes to cross the track. Motorcyclists are using a pedestrian bridge over the railway line near Gondwanaland Phattak.

The bridge was constructed by the administration with an expenditure of Rs5 million a few years ago. The bridge has developed cracks.

People fear that in this situation, the pedestrian bridge may collapse anytime. The have demanded the opening of level crossings and reconstruction of the pedestrian bridge.

Published in Dawn, April 18th, 2020

Opinion

Editorial

Energy inflation
Updated 23 May, 2024

Energy inflation

The widening gap between the haves and have-nots is already tearing apart Pakistan’s social fabric.
Culture of violence
23 May, 2024

Culture of violence

WHILE political differences are part of the democratic process, there can be no justification for such disagreements...
Flooding threats
23 May, 2024

Flooding threats

WITH temperatures in GB and KP forecasted to be four to six degrees higher than normal this week, the threat of...
Bulldozed bill
Updated 22 May, 2024

Bulldozed bill

Where once the party was championing the people and their voices, it is now devising new means to silence them.
Out of the abyss
22 May, 2024

Out of the abyss

ENFORCED disappearances remain a persistent blight on fundamental human rights in the country. Recent exchanges...
Holding Israel accountable
22 May, 2024

Holding Israel accountable

ALTHOUGH the International Criminal Court’s prosecutor wants arrest warrants to be issued for Israel’s prime...