Low Graphics Site
White bar
.: Latest News :. .: News in Pictures :.
Dawn e-paper

Daily SectionMarker



Misc SectionMarker

Horoscope Recipes Weekly SectionMarker

Weekly SectionMarker



Pakistan's Internet Magazine
Herald

Archive, Search

Weather

FrontPage National International Local Business KSE Forex Sports Editorial Opinion Letters Features Today's Cartoon TV Guide Cowasjee Irfan Hussain Jawed Naqvi Mahir Ali Kamran Shafi The Review Dawn Magazine Young World Images Dawn Group Subscription To Advertise

Previous Story DAWN - the Internet Edition Next Story


September 21, 2008 Sunday Ramazan 20, 1429



Atom-smasher shut for two months


GENEVA, Sept 20: The world’s largest atom-smasher has been shut down for two months following a helium leak, just 10 days after it was switched on amid great fanfare to probe the secrets of the universe.

“There has been an incident in a test. One section of the machine will have to be repaired,” James Gillies, a spokesman for the European Organisation for Nuclear Research (CERN), told AFP.

CERN said in a statement that a fault occurred on Friday afternoon, resulting in a “large helium leak into the tunnel.

“Preliminary investigations suggest that the most likely cause of the problem was a faulty electrical connection between two magnets, which probably melted at high current leading to mechanical failure,” it said.

There was no risk to people, added the centre, saying that a full probe was under way.

“There are people in the tunnel right now, we’ll be giving updates as soon as we can,” said Gillies.

The Large Hadron Collider (LHC) was started on September 10, with physicists cheering the successful testing of a clockwise beam, comprising strings of protons, and then an anticlockwise beam in preparatory testing ahead of first collisions.

But the LHC had to be shut down a week later due to an electrical hitch that affected a cooling system for high-powered magnets designed to steer beams of particles around the LHC’s 27km circular tunnel.

The cooling system is important as the steering magnets in the LHC tunnel are chilled to as low as -271 degrees Celsius, which is close to absolute zero and colder than deep outer space.

At this extreme temperature, electrical currents overcome resistance, thus making it easier and cheaper to power electro-magnets.

The LHC was only turned back on again on Friday, but the latest setback has once again forced operations to halt.

As the sector where the fault occurred would have to be warmed up from its extreme temperature for repairs to take place, the LHC would now be halted for “a minimum of two months,” resulting in further delays to the first collisions.

The LHC took nearly 20 years to complete and at $5.46 billion is one of the costliest and most complex scientific experiments ever attempted.

It aims to resolve some of the greatest questions surrounding fundamental matter, such as how particles acquire mass and how they were forged in the Big Bang that created the universe some 13.7 billion years ago.—AFP







Previous Story Top of Page Next Story

RSS Feed

Newsletters

DAWN Logo

News on Mobile

e-paper print replica


The DAWN Media Group

| About Us | Advertising info | Subscription | Feedback | Contributions | Privacy Policy | Help | Contact us |