KARACHI: Oil and Gas Development Company Ltd (OGDC), operator with joint venture partners PPL and GHPL, has successfully tested and completed Nashpa Well No. 6 and 7 development production lasewells in Nashpa Development and Production Lease, which falls in district Karak and Kohat of Khyber Pakhtunkhwa.

In a filing with the PSX, the company stated that the structure of Nashpa Well No.7 was delineated, drilled and tested using OGDCL’s in-house expertise. The well was drilled down to the depth of 4,596 metres, targeting to test the hydrocarbon potential of Datta and Shinawari formations. The zone has produced 2,700 barrels per day of crude oil and 7.4 mmscfd of gas through 36/64-inch choke at well head flowing pressure 1,886 pig. Furthermore, laying of 1.86-km pipeline has been completed and the well would be injected into the system within this week.

Likewise Nashpa Well No.6 was also delineated, drilled and tested. The well was drilled down to the depth of 5,025 metres, targeting to test the hydrocarbon potential of Kingriali, Datta, Shinawari, Samanasuk, Lumshiwal and Lockhart formations. However, hydrocarbons have been successfully tested in Lumshiwal and Lokhart formations.

The zones have produced 2,550 barrels per day of crude oil and 16.3 mmcsfd of gas through 36/64-inch choke at well head flowing pressure 2,667 pig. Furthermore, laying of 7-km pipeline is in progress and the well would be injected into the system by mid of Sept 2016.

Published in Dawn, August 25th, 2016

Follow Dawn Business on Twitter, LinkedIn, Instagram and Facebook for insights on business, finance and tech from Pakistan and across the world.

Opinion

Editorial

Dangerous law
17 May, 2024

Dangerous law

OUR political leaders never seem to learn from their mistakes. The Punjab Assembly is due to vote on a new ...
Uncalled for pressure
17 May, 2024

Uncalled for pressure

THE recent press conferences by Senators Faisal Vawda and Talal Chaudhry, where they demanded evidence from judges...
KP tussle
17 May, 2024

KP tussle

THE growing war of words between KP Chief Minister Ali Amin Gandapur and Governor Faisal Karim Kundi is affecting...
Dubai properties
Updated 16 May, 2024

Dubai properties

It is hoped that any investigation that is conducted will be fair and that no wrongdoing will be excused.
In good faith
16 May, 2024

In good faith

THE ‘P’ in PTI might as well stand for perplexing. After a constant yo-yoing around holding talks, the PTI has...
CTDs’ shortcomings
16 May, 2024

CTDs’ shortcomings

WHILE threats from terrorist groups need to be countered on the battlefield through military means, long-term ...