JIT report to ascertain cause of Gujranwala train accident: Saad Rafique

Published July 6, 2015
Apparently the train runs at an excessive speed when gets derailed.—DawnNews screen grab
Apparently the train runs at an excessive speed when gets derailed.—DawnNews screen grab

LAHORE: Federal Railways Minister Khawaja Saad Rafique on Monday shared details of the recent train accident that claimed 19 lives and said that a report of the joint interrogation team (JIT) would be released within the next three days.

The locomotive and three carriages carrying soldiers from Pano Aqil to Kharian had plunged into a canal on July 2 near Gujranwala, apparently due to collapse of a bridge. In an initial response, Rafique had said that no evidence of terrorism was found but the possibility of sabotage could not be ruled out in the tragedy.

Addressing a press conference, the PML-N leader said that the locomotive was overspeeding and the driver had pulled emergency break some 945 feet before the Chanawan Bridge as a result of which the engine and bogies derailed.

He further said that the train had mysteriously exceeded the speed limit before the accident occurred.

Khawaja Saad said that the locomotive had not even come to a halt at the “stop dead” point where the train diver was supposed to take a break and sign a paper before leaving the signal.

"Let the JIT decide if terrorism was behind the derailment of the train," the federal railways minister said while responding to a question.

Know more: 17 die as train carrying troops plunges into canal

The minister said that investigators are looking into the reason behind the train driver's sudden change in speed.

He also said that the driver was one of the senior most drivers and was scheduled to retire after a few months.

Khawaja Saad Rafique confirmed that a Naib Subedar of the Pakistan Army was also present along with the driver in the driving cabin of the engine.

Talking about bridges, he said that there are 13,959 bridges in the network of Pakistan Railways, out of which 159 bridges need some repair works. However, he made it clear that the condition of the Chanawan Bridge was pretty good.

Another train had crossed the same bridge, just 15 minutes prior to the accident, the federal railways minister added.

Opinion

Editorial

Missing links
Updated 27 Apr, 2024

Missing links

As the past decades have shown, the country has not been made more secure by ‘disappearing’ people suspected of wrongdoing.
Freedom to report?
27 Apr, 2024

Freedom to report?

AN accountability court has barred former prime minister Imran Khan and his wife from criticising the establishment...
After Bismah
27 Apr, 2024

After Bismah

BISMAH Maroof’s contribution to Pakistan cricket extends beyond the field. The 32-year old, Pakistan’s...
Business concerns
Updated 26 Apr, 2024

Business concerns

There is no doubt that these issues are impeding a positive business clime, which is required to boost private investment and economic growth.
Musical chairs
26 Apr, 2024

Musical chairs

THE petitioners are quite helpless. Yet again, they are being expected to wait while the bench supposed to hear...
Global arms race
26 Apr, 2024

Global arms race

THE figure is staggering. According to the annual report of Sweden-based think tank Stockholm International Peace...