PESHAWAR: The Provincial Development Working Party (PDWP) has approved 10 projects for the development of various districts of Khyber Pakhtunkhwa.

The PDWP meeting was held at the Planning and Development Department with additional chief secretary Khalid Pervez in the chair on Wednesday, according to a handout.

While considering a total of 16 projects under the ADP 2014-15, the forum approved 10 of them with an estimated cost of Rs1.5 billion. The meeting was attended by the administrative secretaries and senior staff of the planning and development, finance, environment, C&W, LG&RD, elementary and secondary education, higher education, health, industries, relief and rehabilitation, and irrigation departments.

Approval of six projects was deferred due to unavailability of detailed information and supporting documents. The departments were directed to take further time to improve the project documents with proper planning and cost estimation so that the projects could be executed smoothly without any problem. The forum directed that in future the consultants should accompany the department for presenting the detailed design to the PDWP.

The approved projects include continuation of ongoing ADP schemes for completion in 2014-15, consultancy for construction of girls hostel at Shaheed Benazir Bhutto University, Sheringal, Upper Dir, provision of mobile medical services in Khyber Pakhtunkhwa, improvement/construction of eight-kilometer road from Kirai to Mole Sar, Besham tehsil.

The list also includes the improvement and construction of 10-kilometre road from Sasobay to Kormang, Shangla; construction of flood protection structure and rehabilitation of drainage system along Badri Nullah, Parthogai drainage system Indus River and other small tributaries in Swabi district;

rehabilitation and improvement of canal and patrol road/bridges along Pehur Main Canal and its sub-system in Swabi district; establishment of government colleges in the province besides some other projects. The next PDWP meeting would be held after two weeks.

Published in Dawn, September 18th, 2014

Opinion

Editorial

Energy inflation
Updated 23 May, 2024

Energy inflation

The widening gap between the haves and have-nots is already tearing apart Pakistan’s social fabric.
Culture of violence
23 May, 2024

Culture of violence

WHILE political differences are part of the democratic process, there can be no justification for such disagreements...
Flooding threats
23 May, 2024

Flooding threats

WITH temperatures in GB and KP forecasted to be four to six degrees higher than normal this week, the threat of...
Bulldozed bill
Updated 22 May, 2024

Bulldozed bill

Where once the party was championing the people and their voices, it is now devising new means to silence them.
Out of the abyss
22 May, 2024

Out of the abyss

ENFORCED disappearances remain a persistent blight on fundamental human rights in the country. Recent exchanges...
Holding Israel accountable
22 May, 2024

Holding Israel accountable

ALTHOUGH the International Criminal Court’s prosecutor wants arrest warrants to be issued for Israel’s prime...