DUBAI: Dubai on Monday completed a solar plant big enough to power 50,000 homes as part of a plan to generate three-quarters of its energy from renewables by 2050.

The 200 megawatt plant sprawls over 4.5 square kilometres (1.73 square miles) of desert and includes some 2.3 million photovoltaic panels.

It is the second phase of the Mohammed bin Rashid Al-Maktoum Solar Park, which is set to pump out a total of 1,000 megawatts by 2020, the Dubai Electricity and Water Authority said.

The $326m (300m euro) second phase was built by a consortium including Saudi Arabia’s ACWA Power and Spain’s TSK.

DEWA chief Saeed al-Tayer said the operators would sell power to the public utility company.

The project is the “largest and first solar power project of its kind in the region”, he said.

“The state has begun early in preparing to say goodbye to the last drop of oil, through a clear strategy including investments in power generation plants that use various solar power technologies,” Tayer said.

The solar park’s first phase came online in 2013, with 152,000 panels producing 13 megawatts.

DEWA said in December the second phase of the project had set a world record for cheap solar energy, at 5.6 US cents (5.2 euro cents) per kilowatt hour.

Last year, DEWA awarded the third and final phase of the project, an 800 megawatt extension to the park, to a consortium led by Abu Dhabi’s Masdar.

The Gulf emirate currently has a total generating capacity of 10,200 megawatts, Tayer said.

Dubai is part of the oil-rich United Arab Emirates, but has few oil reserves itself.

The bulk of crude production is concentrated in Abu Dhabi.

Published in Dawn, March 21st, 2017

Opinion

Editorial

IMF’s projections
Updated 18 Apr, 2024

IMF’s projections

The problems are well-known and the country is aware of what is needed to stabilise the economy; the challenge is follow-through and implementation.
Hepatitis crisis
18 Apr, 2024

Hepatitis crisis

THE sheer scale of the crisis is staggering. A new WHO report flags Pakistan as the country with the highest number...
Never-ending suffering
18 Apr, 2024

Never-ending suffering

OVER the weekend, the world witnessed an intense spectacle when Iran launched its drone-and-missile barrage against...
Saudi FM’s visit
Updated 17 Apr, 2024

Saudi FM’s visit

The government of Shehbaz Sharif will have to manage a delicate balancing act with Pakistan’s traditional Saudi allies and its Iranian neighbours.
Dharna inquiry
17 Apr, 2024

Dharna inquiry

THE Supreme Court-sanctioned inquiry into the infamous Faizabad dharna of 2017 has turned out to be a damp squib. A...
Future energy
17 Apr, 2024

Future energy

PRIME MINISTER Shehbaz Sharif’s recent directive to the energy sector to curtail Pakistan’s staggering $27bn oil...