LAHORE, May 22: A portion of an under-construction overhead pedestrian bridge on Ring Road collapsed on Wednesday.

The incident took place in Defence Phase-IV near Kamahan village which led to the blockage of traffic on Ring Road. It is the second incident of bridge collapse. Earlier, one such pedestrian bridge had collapsed on Ring Road near Harbanspura last year and a truck driver was killed when the structure fell on his vehicle.

A CDGL spokesman said the construction work on the pedestrian bridge had been suspended after the Ring Road Authority had objected to its quality. He said the traffic was blocked for sometimes to facilitate the officials to remove the structure.

Opinion

Editorial

By-election trends
Updated 23 Apr, 2024

By-election trends

Unless the culture of violence and rigging is rooted out, the credibility of the electoral process in Pakistan will continue to remain under a cloud.
Privatising PIA
23 Apr, 2024

Privatising PIA

FINANCE Minister Muhammad Aurangzeb’s reaffirmation that the process of disinvestment of the loss-making national...
Suffering in captivity
23 Apr, 2024

Suffering in captivity

YET another animal — a lioness — is critically ill at the Karachi Zoo. The feline, emaciated and barely able to...
Not without reform
Updated 22 Apr, 2024

Not without reform

The problem with us is that our ruling elite is still trying to find a way around the tough reforms that will hit their privileges.
Raisi’s visit
22 Apr, 2024

Raisi’s visit

IRANIAN President Ebrahim Raisi, who begins his three-day trip to Pakistan today, will be visiting the country ...
Janus-faced
22 Apr, 2024

Janus-faced

THE US has done it again. While officially insisting it is committed to a peaceful resolution to the...